BBIN宝盈集团

Customer Feedback

2 Axle 40 Ton Drop Deck Trailer will be sent to Uganda

2 Axle 40 Ton Drop Deck Trailer for Sale In Uganda2 Axle 40 Ton Drop Deck Trailer for Sale In Uganda

Uganda customer's 2 axle drop deck trailer was completed. Ready to send to Uganda. This customer learned that we have an new year sales, and old customers also have exclusive offers. The customer ordered 5 more flatbed semi trailers again.

To be honest, this customer has always been our old customer, he has his own business in Uganda, in addition to being a local distributor. He has placed orders in our factory more than once. He said that our trailers are very popular locally.

High-quality product quality, good reputation in the industry, and perfect after-sales service are important reasons why TITAN VEHICLE is going further and further in the semi trailer industry. And it is also the primary factor we rely on for more and more customers. We are professional enough to be trusted by you.

2 Axle 40 Ton Drop Deck Trailer for Sale In Uganda2 Axle 40 Ton Drop Deck Trailer for Sale In Uganda

Directions for use and care of 2  Axle 40 Ton Drop Deck Trailer

Before connecting, inspect and remove any sand, dust or other foreign matter from the surface of the tow vehicle's hitch and on the 2 axle 40 ton drop deck trailer hitch pins and hitch pin plates to check for adequate grease. In order to connect smoothly, the support device should be operated to make the height of the 2 axle 40 ton drop deck trailer fit with the height of the tractor's tow deck. Generally, the trailer's tow deck is about 10--30MM lower than the center of the tractor's tow deck. .Otherwise, it will not only fail to connect, but also damage the traction seat, traction pin and related parts.

Operate the locking mechanism of the towing seat to open the locking block, and then check whether the locking block is opened to a free state. Reverse the tractor, and make the 2 axle 40 ton drop deck trailer tow pin enter the locking mechanism through the V-shaped opening of the towing seat. The opening is opened, and the locking block is rotated, and the locking block and the traction pin are automatically locked.

Check whether the locking mechanism of the traction seat has locked the traction pin, and whether the locking is safe and reliable. Move the tractor slightly forward to check the connection.

2 Axle 40 Ton Drop Deck Trailer for Sale In Uganda2 Axle 40 Ton Drop Deck Trailer for Sale In Uganda

Air connection

Connect the two air connectors on the tractor to the two air connectors on the drop deck trailer.

Note: Do not connect wrongly, the right side of the 2 axle 40 ton drop deck trailer in the forward direction is the air connection of the inflation line, and the left is the air connection of the control line. After the air connectors are connected to each other, unscrew the semi-trailer air circuit connection and separation switch on the tractor to make the air circuit in a ventilated state, otherwise it will not be able to supply air to the trailer braking system and the braking system will not work.

Start the engine, observe the air pressure gauge in the cab, and increase the pressure in the air storage tank of the tractor and semi-trailer to the specified pressure. Check whether there is air leakage in the air circuit and whether the braking system is working properly.

Circuit connection

Insert the cable connection plug of the tractor into the cable connection socket at the front end of the semi-trailer. Check whether the electrodes are well combined, and confirm whether the lights work normally.

2 Axle 40 Ton Drop Deck Trailer for Sale In Uganda2 Axle 40 Ton Drop Deck Trailer for Sale In Uganda

Precautions

1. First, check whether the center bolt of the leaf spring is broken, whether the leaf spring is in series and broken, and if it is broken, it should be replaced in time.

2. Loosen the locking bolts of the diagonally adjustable pull rods on the front and rear axles.

3. After adjusting the wheelbase, let the car go on the S-shaped road for about 1 km and then re-adjust the wheelbase, and adjust the wheelbase twice in the same way until the wheelbase does not change, and then lock the adjustable tie rod bolts.

2 Axle 40 Ton Drop Deck Trailer for Sale In Uganda2 Axle 40 Ton Drop Deck Trailer for Sale In Uganda

Traction pin and fixed friction plate:

Check the traction pins monthly for damage, cracks and premature wear. Check the traction pin fastening bolts for looseness, and if so, tighten them in time.

Measure the diameter of the traction pin, if the diameter is smaller than the limit size, it should be repaired or replaced. Check the fixed friction plate for scratches, twists and foreign objects, and repair if necessary.

When there is a gap between the traction pin and the saddle, adjust the adjusting bolt on the left side of the saddle, rotate it about 10mm outward, pull out and loosen the handle of the saddle, and tighten the adjusting screw when the vehicle feels no loose impact block.

Servicing the saddle:

When the car is lifted for a week, the head of the car should be removed and the surface of the saddle should be cleaned with diesel oil, then the oil and rust should be wiped off, and grease should be applied. After that, it should be cleaned and refueled once a month.

Outriggers:

When leaving the tractor, if the terrain is the reason, it is necessary that the lower part of the outrigger should be padded with a wooden block to prevent the outrigger from being damaged or sinking due to exceeding the stroke. Check the lights, if there are cracks or broken wires, they should be replaced.

在线留言

whatsapp
BBIN宝盈集团